Table of Contents
- The Short Answer
- Why a Quote Is Not a Specification
- Three Questions About What You Are Buying
- Three Questions About the Sample and the Carton
- Three Questions About Supply and Change
- The Tenth Question and the First Production Batch
- One Page That Turns Ten Answers Into Order Terms
- Conclusion
- Frequently Asked Questions
- Related Reading
A quotation arrives with a part number, a unit price, a minimum order quantity and a delivery window. Your team has already printed samples on the real carton, the code looked right, and the purchase order goes out with those four things on it. Nothing on it says which surface condition the sample was printed on, or what should happen if the first pallet behaves differently.
Six weeks later the first production batch arrives and the code smudges when cartons are stacked. The supplier points to the datasheet, your team points to the sample, and neither document describes what was actually agreed. Both sides are acting in good faith. The agreement simply never got written down in a form either side could check at goods-in.
The Short Answer
A quote describes a commercial deal. An order attachment describes what counts as acceptable. Before you send the first purchase order to a TIJ ink supplier, put ten answers in writing: the substrate and its surface condition, the exact printer and cartridge reference, how drying and adhesion will be accepted, which batch the approved sample came from and who keeps a retained sample, what appears on the carton and the shipping document, storage and shelf life terms, minimum order quantity and lead time, how a future change is notified, who answers when a batch fails, and what happens if the first production batch does not match the sample.
That is one page, not a contract negotiation. It is the difference between a supplier who agreed to a price and a supplier who agreed to a result. If you are still deciding which supplier to shortlist, that is a different job, covered in how to choose an industrial ink cartridge supplier. This article starts after that decision has been made.
Why a Quote Is Not a Specification
A quotation is built to be compared. It reduces a product to a part number, a unit price, a quantity and a delivery window, because those are the fields a buyer needs to rank three offers. A specification attachment is built to be enforced. It names the material, the machine, the test and the person who decides whether the result passes.
Most first-order disputes are not about bad ink. They are about a document that was asked to do two jobs and only did one. “Suitable for plastic film” is a useful sentence in a sales email and a useless sentence in a delivery dispute, because nobody can test “suitable.” “Code remains legible after the agreed rub test on this specific film at this line speed” is testable. One of those belongs in the attachment.
Three kinds of terms go into a first order, and only the first usually makes it onto the purchase order: commercial terms, technical acceptance terms and responsibility terms. The commercial ones are already there. The other two are what the ten questions below produce.
| A quote usually says | The attachment should say | What it prevents |
|---|---|---|
| “TIJ solvent ink, black” | Exact cartridge or ink reference, revision, and the printer or firmware family it was confirmed with | A compatible-looking part that was never confirmed for your machine |
| “Works on plastic” | Substrate name, surface condition, line speed, and the point at which the code is handled | “Works on everything” becoming an argument after a rub-off |
| “Fast drying” | The acceptance test and its conditions, including how long after printing it is run | Two sides measuring dry time differently |
| “Standard packaging” | Batch number, production date, shelf life and storage marks on carton and shipping document | A delivery that cannot be traced back to a lot |
None of this requires a legal department. It requires somebody to write down what the sample actually proved, before the first payment rather than after the first complaint. The same logic appears in a narrower form in the procurement guide to new versus refilled cartridges, where the order has to state whether the printhead is new or previously used. That distinction matters there; the ten questions below are the general version for any first ink order.
Three Questions About What You Are Buying
The first three questions define the thing being ordered. If they are vague, everything downstream is unenforceable, because there is no fixed object for the rest of the attachment to refer to.
Question 1: Which substrate, in which surface condition, is this ink accepted on?
Ask for the material by name and by condition, not by category. “Plastic” covers films that behave nothing alike: a corona-treated PE film, an untreated PP sheet, a lacquered carton and a shrink sleeve with release agent on the surface will give four different results from the same cartridge. Write down the grade, whether it is coated, printed, varnished or treated, whether the surface is flat or curved, and what the code has to survive afterwards: stacking, shrink wrapping, a rub from a conveyor guide, a wipe-down, cold storage.
Then make the surface condition part of the order. If a corona-treated film arrives with the treatment aged out, the ink did not change, but the result will, and a specification that names the surface condition gives both sides a place to start. Why TIJ ink peels off plastic film explains the mechanism behind that variation. It is worth agreeing who supplies the test material too, because a criterion that only exists in the supplier’s lab is hard to apply at goods-in.
Question 2: Which printer model, firmware family and cartridge reference does this order cover?
The useful answer names all three. A cartridge reference alone identifies a consumable, not a validated combination; the same consumable can behave differently with a different controller revision or a different print parameter set. Ask the supplier to state, in writing, the machine model, the firmware family it was characterised with, and the exact ink or cartridge reference including revision.
Put that sentence in the attachment verbatim. It also solves a quieter problem: when a second plant orders “the same ink” six months later, the referenced line gives them something to check against instead of a description to interpret. Where the order also contains hardware, the part number and pairing guide for the Q2299A carriage and C6602A cartridge shows why a component identifier is not a configuration statement. Two part numbers can each be correct and still not describe an agreed combination.
Question 3: How will drying and adhesion be measured, and at what point is a code accepted?
“Fast drying” is a direction, not a criterion. Ask for the test that decides acceptance: what is done to the printed code, how long after printing, with what material or load, and what result counts as a pass. For a line that stacks or wraps shortly after coding, the criterion is about that moment, not about a sample left to dry on a desk for an hour. A code that passes after an hour and fails after ten seconds is a rejected code on that line.
Agree the test before the trial, record the conditions, and make the agreed method part of the order rather than an opinion held by whoever is on shift. Ask also who keeps the record and what a failed test looks like in writing. How much friction solvent ink on metal really withstands lays out the practical test methods and the variables that move their results, which is a reasonable starting point for choosing one you can actually repeat on your own material.
Three Questions About the Sample and the Carton
The sample proved something on a particular day, out of a particular batch. These three questions carry that proof into the delivery, so that the first pallet can be compared with something rather than discussed.
Question 4: Which batch did the approved sample come from, and where is the retained sample?
Ask for the sample’s batch number, the date it was produced, and who keeps a sealed retained sample on each side. A trial without a batch number is a demonstration; a trial with one is evidence. When the first production lot behaves differently, the retained sample is what lets both sides compare like with like instead of comparing memories of a print that nobody kept.
Write the arrangement into the attachment: one retained sample held by the buyer, one by the supplier, labelled with the batch and the trial date, and a stated method for comparison if a dispute arises. This is also the point where a supplier’s traceability claim becomes real. If they cannot put a lot number on a sample, it is worth asking how they will put one on a shipment. The habit of keeping the trial record with the decision is the same one described in the broader evaluation process, but here it is being written into an order rather than filed after a meeting.
Question 5: What appears on the carton, the label and the shipping document?
Agree the markings, not just the packaging type. At minimum: ink or cartridge reference, batch number, production date, the shelf life stated for that ink, storage conditions, and the quantity and unit. Ask which of those appear on the outer carton and which on the accompanying document, and in which language. If the receiving team cannot identify the lot without opening a sealed inner pack, the lot is effectively untraced at goods-in.
This is not bureaucracy. It is the same information you will need for a complaint, a stock rotation check or an audit, and it is far cheaper to specify before labels are printed than to reconstruct afterwards. The real pain points of TIJ coding on aluminium foil packaging covers why the sealed barrier around the consumable matters in the first place; the markings are what let you verify that the barrier was respected in transit. Ask what happens to a carton that arrives with the seal broken, and put the answer in one line.
Question 6: What storage, shelf life and transport conditions apply to this ink?
Ask for the figure that belongs to this specific ink, from its datasheet or packaging, rather than a category-wide number. Different formulations age differently, and a number quoted for “TIJ cartridges” without naming the ink and the conditions is not plannable. Then ask how the goods will travel: a winter shipment through a cold region, a container in summer sun, or a parcel left on a loading dock can all move the product outside the conditions its shelf life assumes.
Write the transport requirement and the incoming check into the order, and state who is responsible if goods arrive outside them. Cartridge storage and print timing for cold environments gives a concrete example of temperature terms being written into purchase orders, and how long a solvent cartridge can sit idle covers the related question of what happens after the box is opened. Storage and idle behaviour are your responsibility after delivery; the condition of the goods at delivery is the supplier’s. The attachment should say where that line sits.
Three Questions About Supply and Change
These are the terms that only matter later, which is exactly why they are the ones most often left out of a first order. All three are cheap to agree now and expensive to negotiate during a shortage.
Question 7: What are the minimum order quantity, the lead time and the expedite path?
A verbal lead time is a plan, not a term. Ask for the typical lead time in writing, the MOQ with its unit, the stock policy, and what happens when the line needs material sooner than planned. Ask who authorises an expedite, what it costs, and whether a partial shipment is possible. If the answer is “we usually have stock,” ask what the order says when they do not.
Keep the quantities consistent with how you will actually buy. A MOQ that looks reasonable on a spreadsheet can turn into a year of stored inventory with a shelf life you have just agreed to track. What MOQ actually means for a private-label order explains the cost structure behind those numbers, even if your order is not a private-label one. The point that carries over is simple: the stated minimum is rarely the whole cost of holding the stock.
Question 8: How will a formulation, label or packaging change be notified?
Ask two things: how much notice is given before a change, and whether a change triggers re-qualification. A supplier who improves a formulation is doing the right thing, but an unannounced formulation change on a validated line is still an uncontrolled variable. The order should say which changes require written notice, what the notice period is, and whether a new sample has to be approved before the changed material ships.
This is the term that protects you six months later, when the product you validated and the product being delivered have quietly diverged. It is also the term suppliers most appreciate, because it replaces an argument about blame with a process both sides agreed to in advance. Ask who on the supplier side owns the notification, and where it will be sent; a notice sent to a sales inbox that nobody monitors is not a notice.
Question 9: Who answers when a batch fails, and within what response window?
Ask for a name or a role, an escalation path, and a response window, and put all three in the attachment. “Contact our sales team” is not a failure path. The useful answer says who receives the report, what information they need with it, how quickly they acknowledge it, and whether the diagnosis covers the ink, the printer and the substrate or stops at the consumable.
Ask what evidence should accompany a complaint: photographs of the code, the batch number, the machine settings, the conditions on the line. Agreeing that list now means a problem on a night shift gets documented rather than argued about the next morning. Beyond the certificate: verifying food-grade TIJ ink suppliers goes deeper on documentation where regulated applications are involved. Even outside those applications, the principle holds: the quality of the record decides how fast a complaint can be resolved.
The Tenth Question and the First Production Batch
Question 10: What happens if the first production batch does not match the retained sample?
Every other question is preparation for this one. Agree, before payment, what “does not match” means and what follows: which test is repeated, on which material, by whom; whether the affected lot is held; whether production continues with existing stock; what the remedy is; and who carries the cost of the investigation. Name the person on each side who can declare the batch accepted or rejected.
Then write it as a short sequence rather than a promise. A clause that says “the supplier will resolve any quality issue” resolves nothing at two in the morning. A clause that says the buyer holds the lot, both sides compare against the retained sample within an agreed window, and the agreed remedy follows, gives the night shift something to do. It also protects the supplier from an open-ended claim, which is why a well-written clause is usually welcomed rather than resisted.
An illustrative scenario, not a report of measured results: a plant approves a sample on coated board, receives the first pallet, and finds codes smearing after stacking. Because the order named the substrate condition, the rub test, the sample batch and the retained sample, the comparison took an afternoon. Without those four lines, the same event would have been a week of emails about whose material was at fault. The ink may still have been wrong; the difference is that both sides could establish it.
One Page That Turns Ten Answers Into Order Terms
The table below is the deliverable. Copy it into a one-page document, fill the third column with the supplier’s answers, add a version number and a date, and attach it to the purchase order. Both sides sign it. When something changes, issue the next version rather than editing the old one in place.
| # | Ask for | One line to write into the attachment | Confirmed by |
|---|---|---|---|
| 1 | Substrate and surface condition | Material grade, coating or treatment, flat or curved, what the code must survive | Production or QA |
| 2 | Machine and consumable combination | Printer model, firmware family, exact ink or cartridge reference and revision | Engineering |
| 3 | Drying and adhesion acceptance | Named test, conditions, timing after print, pass or fail criterion | QA |
| 4 | Sample identity | Sample batch number, trial date, retained sample holder on each side | QA and supplier |
| 5 | Carton and document markings | Reference, lot, production date, shelf life, storage marks, language | Goods-in |
| 6 | Storage and transport | Shelf life for this ink, temperature conditions, incoming check, responsibility | Warehouse |
| 7 | MOQ, lead time, expedite | MOQ and unit, written lead time, urgent path, partial shipment rule | Purchasing |
| 8 | Change notification | Which changes, notice period, whether re-qualification is required | Both sides |
| 9 | Failure response | Named contact, escalation, response window, evidence to supply | QA and supplier |
| 10 | First-batch mismatch | Hold rule, comparison against retained sample, remedy, cost owner | Both sides |
Two habits make this page work. Keep each answer to one line, because an attachment nobody reads is no better than an email nobody reads. And date it, because the most common failure is not a missing clause but an old clause being applied to a new material, machine or supplier revision. A version number costs nothing and settles the question of which page was in force when the order was placed.
It is also worth deciding where this page lives. If it sits in somebody’s inbox, it will not be found at goods-in. Attach it to the purchase order in the system that the receiving team actually uses, and put the version number on the receiving checklist. The best specification in the world is useless if the person opening the carton does not know it exists.
Conclusion
Choosing a supplier is a documentation exercise. Ordering from one is a shorter exercise with the same rule: whatever the sample proved has to be written down in a form that can be checked at goods-in. The ten questions above are not a test of the supplier’s honesty. They are a way of making sure that a good sample, a good quote and a good first delivery are all describing the same thing.
Price and quantity belong on the purchase order. What counts as acceptable belongs on the page attached to it. If you want a second pair of eyes on a first order, send us your printer model, substrate, code content and line speed through the contact page, and we will tell you which of these ten lines is most likely to be missing.
Frequently Asked Questions
Do I need a written attachment for a small first order?
Yes, and small orders are where it costs the least to add. One page works for a trial quantity and for a full pallet; the difference is the volume, not the terms. A first order is also where the sample and the retained sample are easiest to identify, so it is the best moment to establish the habit before there are twenty orders to keep track of.
Is the supplier’s datasheet enough?
It is necessary but it is not specific to your combination. A datasheet describes the ink. The attachment describes the ink on your material, in your machine, judged by an agreed test. Keep the datasheet as a reference and quote the relevant lines, but do not rely on it to name your substrate or your acceptance criterion.
Who should sign the one-page attachment?
Somebody on each side who can commit to the technical terms, not only to the price. On the buyer’s side that is usually QA, engineering or production, with purchasing holding the document. On the supplier’s side it should be a technical or quality contact rather than a sales-only contact, because that is the person who will answer if a batch fails.
What if a supplier will not put a batch number or a change notice in writing?
Treat it as information rather than a deal-breaker. Some suppliers can trace a lot internally but will not commit to a notice period on a first order. Ask which terms they can confirm, record the ones they cannot, and decide whether that gap is acceptable for the application. It is a much easier conversation before the order than during a complaint.
How often should the attachment be updated?
Whenever a named input changes: a new substrate, a new printer or firmware revision, a new line speed, a new code content, or a notified supplier change. Re-issue the page with a new version number and date. An unchanged attachment applied to a changed process is the most common way a good specification quietly stops protecting anyone.
Does this replace the supplier evaluation?
No. The evaluation decides who to buy from; this attachment records what was agreed with the one you chose. If you have not yet compared suppliers on compatibility, evidence, traceability and change control, start with the eight-criteria supplier checklist and come back to this page once the decision is made.
Related Reading
- How to Choose an Industrial Ink Cartridge Supplier: A Practical Guide for Production Teams — the eight criteria for deciding who to shortlist, before any order is written.
- New vs Refilled TIJ Cartridges for Packaging Lines: A Procurement Guide — how to state exactly what is new, refilled or reconditioned in an order.
- Beyond the Certificate: A Practical Checklist for Verifying Food-Grade TIJ Ink Suppliers — document verification where compliance claims are part of the purchase.
- Surface Energy 101: Why TIJ Ink Peels Off Plastic Film — why “plastic” is not a substrate specification.
- How Long Can a Solvent TIJ Cartridge Sit Idle? Storage, Shelf Life and Decap Time — what the shelf life figure on the box does and does not promise.
Michael Torres
VP of Sales, FirstColor Image Ltd
Michael Torres leads the global sales organization at FirstColor, managing relationships with enterprise customers acros...
View Profile →